The geographical location of Dois Córregos unit, nearby highway and railway networks of the central region of São Paulo state, facilitates its production flow.
|
|
• Foundation: 1947 • Location: Dois Córregos – São Paulo • Distance from São Paulo: 280Km Installed Capacity • Grinding: 7,500 t/day • Sugar: 18,500 bags/day • Ethanol: 220 m³/day • Installed power: 4.5 MW
|
|